Where
Trento, Italia
Project
Faculty of Literature and Philosophy
Designer
Ishimoto & Partners
Products
Concerto, Omnia, Thesi
Total seats
2500
Year of completion
2012

From the design standpoint, the new department of Literature and Philosophy is organised in a sequence of multi-level volumes and spaces strategically located in the city that make it the entry “portal” to the new university system. From the interior design standpoint, the construction site was meticulously followed from the first concrete laying for 3 years until work was completed. The auditorium was completed with Concerto chairs while 2000 Omnia and 200 Thesi chairs were used for the others.

 

Dal punto di vista progettuale, la nuova Facoltà di Lettere e Filosofia è organizzata in una sequenza di volumi e di spazi multipiano collocati strategicamente nella città che la rendono il “portale” d’ingresso al nuovo sistema universitario. Dal punto di vista dell’arredo interno il cantiere è stato seguito, certosinamente, dal getto del primo impalcato per 3 anni fino a completamento dell’opera. L’Aula Magna è stata realizzata con Concerto, mentre per le altre sono state impiegati 2000 posti Omnia e 200 Thesi.

 

Where
Trento, Italia
Project
Science and Technology Centre Fabio Ferrari
Designer
Ishimoto & Partners
Products
Omnia, Thesi
Total seats
3520
Year of completion
2010

The university science and technology centre “Fabio Ferrari”, prominent physicist and central figure in the development of the University of Trento, is designed to meet courses in the Faculty of Mathematical, Physical and Natural Sciences and the Faculty of Engineering, as well as housing several general services. Construction was begun on 12 June 2007 and completed in May 2010. During spring 2010, Ares Line provided around 2,500 Omnia bench seats, 120 Thesi bench seats, 500 Omnia Contract chairs and about 400 Matrix and Smart office chairs.

 

Il Polo scientifico-tecnologico “Fabio Ferrari”, insigne fisico e figura centrale nello sviluppo dell’ateneo trentino, è destinato a soddisfare le esigenze dei corsi di laurea delle Facoltà di Scienze matematiche, fisiche e naturali e di Ingegneria e a contenere alcuni servizi generali. I lavori di costruzione sono stati affidati il 12 giugno 2007 e sono stati ultimati nel maggio 2010. Durante la primavera 2010, Ares Line ha fornito circa 2500 posti banco
Omnia, 120 posti banco Thesi, 500 sedute Omnia Contract e circa 400 sedute da ufficio Matrix e Smart.